Trafalgar Wharf, Cosham, Hampshire

Client: Magma Global


Job Value: £505,524.38


Programme – 14 weeks (completed on time with additional works)


Subcontractors:

UXO – First Line Defence Design

Sub-Consultants: Civil & Structural – KPT Design


Scope of Works

Principal Contractor role direct for the client carrying out surveys and design for the new proposed foundations, site strips, drainage, reduced level excavation, soil classification, confirmation of piling platform, unexploded ordinance clearance, pile probing, piling attendance, muck away, reinforced concrete foundations (piled and non-piled), brushed concrete hardstanding’s, design and install of new surface water drainage, design and installation of new tarmac car park.


Further Details

RDBL provided many savings across the scheme, by reducing the quantity of piles and size of foundations, as well as proving that the existing hard standings were suitable for piling from. Thus removing the need for a proposed new temporary piling platform. Soil testing was carried out and the design then amended so that only inert materials were excavated with existing sub-base tested and reused in the new construction. Existing drainage was surveyed and pile positions designed around the existing drainage to ensure it did not need removing and renewing.


New drainage was installed to suit the revised external levels with new manholes and drainage runs, the practical design approach kept costs within the allocated client budget. A new car park was requested and a full survey, design and installation carried out including line marking.